Client
GALAXY ENTERTAINMENT GROUP
Executive Architect
Wong Au Yeung Architect
Architect
10 design
Facade Consultant
Inhabit
Main Contractor
China State Construction Engineering Corporation
As one of the features of Galaxy Phase IV (Theater Project) , this initiative achieved millimeter-level installation accuracy through advanced engineering solutions. Utilizing a high-precision total station 3D coordinate positioning system , the team successfully assembled 594 sets of non-standard customized units with a tolerance control of ±10mm , overcoming critical challenges including:
- Multi-dimensional angular adjustments (±15°) under complex spatial configurations
- Synchronous positioning for high-altitude hoisting in constrained environments
- Non-linear geometric constraints and limited workspace conditions